loader image

Commercial EV Charger Installation in Dubai & the UAE

Turn your building’s parking into a revenue-generating EV charging facility — with load management, RFID billing and a full AMC, managed by one team.

 
RFID & App Billing Ready
Utility Approvals Handled
SLA-Backed AMC

DEWA-Approved • All Emirates

Utility approvals across Dubai, AD, Sharjah & RAK.

300+
Commercial Bays
Installed
All Brands
AC & DC Chargers
SLA
Response Guarantee
4
Emirates Served

One vendor for your building's entire EV charging rollout

Facility managers and developers need a charging partner they can hand the whole project to — not a supplier who installs and disappears. GreenByte supplies, installs, commissions and maintains commercial EV charging for offices, residential buildings, hospitality, retail and fleet depots across the UAE, with a single point of contact from first survey to ongoing AMC.

We design load management from the outset so you can add chargers as EV demand grows, without expensive supply upgrades. RFID and app-based billing turns parking into a revenue stream, and utility approvals — DEWA, ADDC, SEWA or FEWA depending on your emirate — are handled by our team.

A complete commercial EV charging solution

From a 4-bay office carpark to a 100-bay community rollout — the full scope, delivered.

 

AC & DC Chargers

7 kW to 22 kW AC for buildings; 50–150 kW DC for fast-charge bays, fleet depots and public sites.

DEWA Approval

Dynamic load balancing shares available supply across all bays — maximise charger count without a costly supply upgrade.

RFID & App Billing

Charge residents, tenants or visitors per kWh via RFID card, mobile app or QR — turning parking into revenue.

Utility Approvals

We handle DEWA, ADDC, SEWA or FEWA approvals — including load studies, Green Charger programme documentation and signage.

Central Management

Monitor all chargers, view energy and session data, manage user access and billing from a single cloud dashboard.

SLA-Backed AMC

Preventive maintenance, remote diagnostics and guaranteed response times — so your chargers stay available for tenants.

Suitable for

What's covered in our scope

How a commercial rollout works

01

Site Survey

We assess parking layout, supply capacity and existing infrastructure.

02

Design & Quote

Load management design, charger specification and a fixed project quote.

03

Utility Approval

We file load studies and approval docs with the relevant authority.

04

Installation

Certified installation, load management commissioning and billing setup.

05

Handover & AMC

Dashboard training, documentation and the start of your AMC plan.

One partner, accountable end to end

FM companies and developers choose us for a single accountable partner — not a supplier who steps away after installation.

Full Turnkey Scope

Supply, install, billing setup and AMC — one vendor, one contract.

Scalable by Design

Load management built in from day one so adding chargers later costs a fraction of a fresh install.

All Emirates, All Utilities

We hold approvals across DEWA, ADDC, SEWA and FEWA — one partner for multi-emirate projects.

Revenue-Enabling

RFID and app billing lets you monetise EV charging for tenants, visitors and the public.

Every emirate, every authority — handled

Commercial EV charging requires load study submissions and utility approval before commissioning. We manage the process with DEWA, ADDC, SEWA and FEWA — including Dubai’s Green Charger programme registration where applicable.

Dubai
DEWA + Green Charger
Abu Dhabi
ADDC / TAQA
Sharjah
SEWA
RAK
FEWA
Multi-emirate
One Point of Contact

You might also need

Get a Fixed Quote After a Free Site Survey

GreenByte provides comprehensive solutions, including EV charging stations, smart home and office automation, and access control systems. We sell, install, and maintain each system from start to finish. Our specialists assess your property in Dubai, Abu Dhabi, Sharjah, and Ras Al Khaimah, then provide a clear, itemized quote with no hidden fees. With prompt response times and dedicated support, we ensure your project stays on schedule. Book your free site survey today to receive a transparent, fixed-price quote tailored to your needs.

Commercial EV charger installation FAQs

Yes. We set up RFID card, mobile app or QR-code billing so you can charge per kWh, per session or via subscription. A revenue split or cost-recovery model can also be configured.
This depends on your existing supply capacity. With dynamic load management we can typically support significantly more chargers than a static analysis suggests — we calculate the exact number during the site survey.
Yes. We prepare all load study documentation, submit to DEWA and handle Green Charger programme registration for eligible sites.
Yes — Dubai, Abu Dhabi, Sharjah and Ras Al Khaimah, with approval management in each emirate's utility authority.
 
Our AMC covers scheduled preventive visits, remote monitoring, firmware updates, fault response within agreed SLA times, and replacement of failed components — keeping your chargers available for tenants.