loader image

Home & Villa EV Charger Installation in Dubai

Professionally installed Type 2 EV charger for your villa or apartment, with DEWA approval, concealed cabling and a mobile app — all from one team.

DEWA approval handled
Fixed pricing, no surprises
Same-week installation

DEWA-Approved Installer

Approval documentation handled for you.

500+
Homes
Charged
7-22 kW
AC Charging
Range
3 yr
Warranty
Same week
Avg.
Install

The right charger for your home, installed properly

Charging at home is faster, cheaper and more convenient than public charging — but a wall charger needs more than just a socket. It requires the correct load calculation, clean cabling, and DEWA approval before you switch it on. GreenByte handles every step: we survey your villa or apartment, recommend the right charger for your car and parking setup, manage the approval, and install it cleanly — usually within the same week.

Because we supply, install and maintain, you get one team responsible for the whole job. If anything needs attention after handover, we come back — no passing you between a supplier and an electrician.

Everything you need to charge at home

From the survey to the mobile app, we cover the whole installation.

Charger Selection

We match the charger to your EV, parking layout and supply — Type 2 from 7 kW to 22 kW.

DEWA Approval

We prepare the load study and approval documentation. You don’t deal with DEWA directly.

Concealed Cabling

Clean, trunked or in-wall cabling routed to your parking bay — no exposed conduit eyesores.

App & Remote Control

Set up on your smartphone — monitor charge level, schedule off-peak charging and get alerts.

All EV Brands

Compatible with Tesla, BYD, BMW, Mercedes, Porsche and all Type 2 electric vehicles.

AMC Available

Add an annual maintenance plan to keep your charger working at full performance year after year.

Villa installation

Apartment installation

From survey to first charge — same week

01

Site Survey

We visit your property, inspect the DB panel, cable route and parking bay.

02

Load Assessment

We calculate available capacity and confirm the right charger model.

03

DEWA Approval

We prepare and submit the load study and DEWA documentation.

04

Installation

Certified electrician installs the charger, cables and mounting cleanly.

05

App Setup & Handover

We connect the app, run a test charge and walk you through the system.

One partner, accountable end to end

We own the whole job — survey, approval, installation and support — so one call resolves anything.

Supply + Install + Maintain

One team, one bill, one point of contact from survey to long-term support.

Same-Week Installation

Most home installs complete within 3–5 days of survey, including DEWA approval.

DEWA-Approved

Every install meets DEWA’s technical requirements and is compliant from day one.

3-Year Warranty

Charger hardware and installation workmanship backed by a 3-year warranty.

DEWA approval — we manage it

Every EV charger installation in Dubai requires a DEWA load study and approval before commissioning. We prepare the technical documentation, submit Form 5 to DEWA, and ensure your installation is compliant — so you don’t have to navigate the process alone.

Dubai
DEWA
Abu Dhabi
ADDC / TAQA
Sharjah
SEWA
Ras Al Khaimah
FEWA
Coverage
Home + Commercial

You might also need

Get a Fixed Quote After a Free Site Survey

GreenByte provides comprehensive solutions, including EV charging stations, smart home and office automation, and access control systems. We sell, install, and maintain each system from start to finish. Our specialists assess your property in Dubai, Abu Dhabi, Sharjah, and Ras Al Khaimah, then provide a clear, itemized quote with no hidden fees. With prompt response times and dedicated support, we ensure your project stays on schedule. Book your free site survey today to receive a transparent, fixed-price quote tailored to your needs.

Home EV charger installation FAQs

Yes. We prepare the load study and Form 5 documentation and submit to DEWA on your behalf. Approval typically takes 2–4 working days, and we factor this into the installation timeline.
We recommend during the site survey based on your EV model, supply capacity and parking layout. For villas, 7 kW or 22 kW Type 2 units are common. For apartments with limited supply, 7 kW is standard.
Yes, though it requires coordination with building management and an assessment of the shared supply. We handle both and can add smart sub-metering so you're only billed for your own charging.
Cost varies with the charger model, cable run and whether a DB upgrade is needed. We provide a fixed itemised quote after the free site survey — with no hidden charges.
Yes. We offer annual maintenance contracts (AMC) covering preventive checks, firmware updates, and priority repairs to keep your charger running at full performance.

Book a free automation consultation

Tell us about your villa, office or project and we’ll design a smart system around how you actually live and work.

 

Phone number

+971554632714

Email

hub@greenbt.com

Location Address :

Dubai, UAE

Book a Free Demo

Takes 30 seconds · No obligation

We’ll reply within 24 hours. Your details are kept private.